Padmount, dry-type and harmonic mitigation for high-density IT load

Data center load is dense, non-linear and expected to grow after commissioning. The equipment decisions that matter are rarely about kVA alone — they are about harmonic content, fire separation and how much headroom the first build leaves for the second.

What drives the specification

Harmonic current from UPS and IT load

Switch-mode power supplies and double-conversion UPS draw non-sinusoidal current. The resulting eddy-current heating is not covered by a standard transformer rating, which is why a K-factor design rather than simply a larger unit is the correct answer. K01 through K30 are available across the dry-type line, and passive harmonic filters bring THDi below 5%, 8% or 12% where IEEE 519 compliance is written into the interconnection agreement.

Fire separation and fluid choice

Where a liquid-filled unit sits close to the building, in an enclosed vault, or under occupied space, fire code and the insurer often drive the fluid decision. Padmount transformers are available with FR3-type less-flammable vegetable oil, which has a substantially higher fire point than mineral oil and is readily biodegradable. Inside the building envelope, dry-type units remove the fluid question entirely.

Headroom for phase two

Sizing to today's load leaves nothing for the next hall. Keeping continuous load at or below 80% of nameplate is the usual rule of thumb, but the impedance choice matters just as much: it sets available secondary fault current and therefore the interrupting rating of every downstream device you will have to live with.

Typical specification

Utility interface
Three-phase padmount, 45–4,000 kVA, dead-front loop feed
Primary voltage
Up to 24,940 GrdY/14,400 V
Fluid
FR3-type vegetable oil where fire separation is required
Interior distribution
Dry-type, 30–3,000 kVA, cast coil or VPI, K-factor rated
Harmonic mitigation
Passive filters to 415 V / 450 kW, THDi < 5 / 8 / 12%
Testing
100% routine tested; PD verification on MV units

What to send us

Send the one-line, the load list with harmonic content, and whether the vault is inside the building envelope. Fluid type, K-factor and impedance come out of that conversation rather than being guessed at.